| 0445 | Remove Ba-133 source and place final corner of shield in position. Start data acquisition: 2 files at each bias in following order: Q = -12 V, P = 0 V; Q = -12 V, P = -4.8 V; Q = -12 V, P = -12 V; Q = +12 V, P = 0 V; Q = +12 V, P = +4.8 V; Q = +12 V, P = +12 V. Initial flash for four hours, followed by 2-hour cooldown; acquisition/flash/cooldown = 5/0.1/20 minutes. |
| | Noticed that DAQ configuration file from Run 41 is using old, incorrect biases for 0 V. Corrected this for two files that shall be used tonight and saved in Run 45 folder. |
| 1050 | Fill LN2 cold trap full. |
| 1300 | DAQ ran into some trouble, spitting out errors. Can't be sure, but suspect this may be due to changing number of events per file while it was running. It appears as though this value is read out in quite a few places, and may have confused it. Use opportunity to remove DCRC31 for re-calibration on bench. |
| 1405 | Recalibrate DCRC31. Plug DCRC31 back into DIB 2 and commence data acquisition while crystal exposed to Ba-133 source: four 40-minute long data series at Q = -4 V, P = 0 V. Acquisition length chosen in attempt to ensure crystal is deneutralised before 6-second flahses. Initial flash for 6 hours followed by 2 hours cooldown. Final flash for 6 hours followed by 2 hours cooldown. Acquisition/flash/cooldown = 40/0.1/20 minutes. |
| 2355 | Fill N2 cold trap full. |