UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20140131

2014/01/31

0025 Reduce 1 K pot temperature to 1.66 K.
Fill N2 cold trap full.
1125 Filled LN2 coldtrap full.
1830 Sheild erected.
2245 Tower temperature appears to have stabilised at 66.5 mK since shield construction. Flash detector: LED 1 on DIB 1; current 0.6 mA; flash-on time 100 μs; flash-off time 5 ms.
2250 Fill N2 cold trap full.
Tower temperature has reached 396 mK. Everything looks fine.
2255 Tower temperature appears to have stabilised at 400 mK. Place Ba-133 source on dewar to aid neutralisation.