| 0010 | Cease helium transfer. Helium liquid level 52.0%. |
| 0025 | Fill N2 cold trap full. Commence cryocleaning mixture through nitrogen cold trap 2. |
| 0250 | Mixing chamber temperature drops below 8 K. Commence evacuation of IVC to extract He-4 exchange gas. |
| 1045 | Fill LN2 coldtraps full. Confirm that mixture is still cyrocleaning (there is still flow). |
| 1115 | Begin LHe transfer (9.8%). |
| 1220 | Finish LHe transfer (94.1%). |
| 1415 | Finish cryocleaning. Pump mixture to dump. |
| 1430 | Isolate IVC at pressure of 1.4E-6 mbar. Isolate dump at 660 mbar. |
| 1445 | Start 1K Pot. |
| 1505 | 1K Pot reached temperature of 1.78K and pressure of 180 mbar. |
| | Filled LN2 cold trap full. |
| 1520 | Commence manual condensation procedure through Cold Trap 1. |
| 1540 | 350 mbar added to fridge for condensation. 310 mbar left in dump. |
| 1700 | Commence circulation procedure with fridge temperature at <3 K. |
| 1745 | Finish manual circulation procedure. Fridge temperature at 295mK and dropping. 1K Pot temperature at 1.775K. G1 at 93mbar, P1 at .19mbar, G2 at 95mbar, P2 at 130mbar. |
| 2330 | Mixing chamber temperature 62.1 mK. Reduce 1 K pot temperature to 1.65 K; stays relatively stable - hopefully situation will improve overnight. Best not to keep playing with the needle valve. Mixing chamber temperature has dropped to 60.0 mK. Leave overnight to witness any improvements. |
| 2335 | Fill N2 cold trap full. |