2014/01/23
| 1120 | Performed tower electrical check: |
|---|
| Detector | G101b | DIB | 1 | |
|---|---|---|---|---|
| side coax | ZB1-1-9 | date/who: | 2014-01-23 | DS AK |
| face | 2 | |||
| +lead | - lead | signal | typical | measured |
| 1 | 2 | QET A | 100 to 200 Ω | open |
| 3 | 4 | QET B | 100 to 200 Ω | open |
| 5 | 6 | QET C | 100 to 200 Ω | open |
| 7 | 8 | QET D | 100 to 200 Ω | open |
| 9 | chassis | LED1 Rforward | 8 to 9 MΩ | 763 kΩ |
| 9 | chassis | LED1 Vforward | 1.0 to 1.1 V | 1.103 V |
| chassis | 9 | LED1 Rreverse | <1 nS | <0.6 nS |
| 10 | chassis | LED2 Rforward | 8 to 9 MΩ | open |
| 10 | chassis | LED2 Vforward | 1.0 to 1.1 V | open |
| chassis | 10 | LED2 Rreverse | <1 nS | <0.2 nS |
| 12 | 11 | Qo C coupling | <1 nS | <0.2 nS |
| 12 | 13 | Qo Rfeedback | 24 to 26 nS | 25 nS |
| 11 | 14 | Q Bias | 12.5 nS | 13 nS |
| 15 | 14 | Qi C coupling | <1 nS | <0.2 nS |
| 15 | 16 | Qi Rfeedback | 24 to 26 nS | 26 nS |
| Detector | G101b | DIB | 2 | |
|---|---|---|---|---|
| side coax | ZB1-6 | date/who: | 2014-01-23 | DS AK |
| face | 5 | |||
| +lead | - lead | signal | typical | measured |
| 1 | 2 | QET A | 100 to 200 Ω | open |
| 3 | 4 | QET B | 100 to 200 Ω | open |
| 5 | 6 | QET C | 100 to 200 Ω | open |
| 7 | 8 | QET D | 100 to 200 Ω | open |
| 9 | chassis | LED1 Rforward | 8 to 9 MΩ | 782 kΩ |
| 9 | chassis | LED1 Vforward | 1.0 to 1.1 V | 1.105 V |
| chassis | 9 | LED1 Rreverse | <1 nS | <0.5 nS |
| 10 | chassis | LED2 Rforward | 8 to 9 MΩ | 783 kΩ |
| 10 | chassis | LED2 Vforward | 1.0 to 1.1 V | 1.106 V |
| chassis | 10 | LED2 Rreverse | <1 nS | <0.4 nS |
| 12 | 11 | Qo C coupling | <1 nS | <0.25 nS |
| 12 | 13 | Qo Rfeedback | 24 to 26 nS | 26 nS |
| 11 | 14 | Q Bias | 12.5 nS | 13 nS |
| 15 | 14 | Qi C coupling | <1 nS | <0.3 nS |
| 15 | 16 | Qi Rfeedback | 24 to 26 nS | 26 nS |
| 1900 | Electrical check performed: no problems revealed. |
|---|---|
| 2030 | IVC sealed. Commence evacuation. |