UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20131114

2013/11/14

1039 Fill LN2 coldtrap full.
1630 At 1320 temperature began to rise. This went unnoticed until now. When noticed the pumps were restarted, though at this point the fridge had reached a temperature of 950 mK. Once the pumps where started the temperature began to decrease.
1830 Mixing chamber temperature appears to have settled at 73.2 mK. Data sets are complete for first four configurations. Restart DAQ. Start flashing detector for 5 hours followed by 2 hour cooldown and data acquisition. Each bias set will consist of four 10-minute data series, interspersed by 30 seconds of flashing and 20 minutes of cooldown.