2013/11/04
| 1030 | Put up clean tent and wipe down. |
|---|---|
| 1310 | Since G2=685.9mbar, G1=0.2mbar, and P1=0.015mbar mixture has been recovered. Isolate dump and remove cold traps from dewar. Begin pumping on cold traps with He4 pump. |
| 1620 | Swapped SQUET card ZC-13 with ZC-23, and attached it to Stripline 19 (DIB 2). |
| Seal IVC and commence evacuation. |