UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20131022

2013/10/22

1630 Electrical check performed on striplines. Results as follows: Stripline 19 had nothing open; Stripline 20 had QoBias open; Stripline 27 had QET A ret (pin 13), QET D ret (pin 43) and Feedback coil C open. Feedback coil C had been diverted through QET C ret (pin 4).