| 1040 | Cryocleaning ceased circulation. Open V6 more to restart cryocleaning. Wait an hour. |
| | Filled LN2 coldtrap full. |
| 1300 | Begin LHe transfer (10.4%). |
| 1310 | Begin pumping mixture to dump. |
| 1400 | End LHe transfer at 91.2% |
| 1436 | Isolated the dump with G2=681 mbar, G1= 0 mbar, P1= 0.013 mbar, and mixing chamber temperature at 11.9 K. Start the 1 K Pot. |
| 1550 | In preparation for condensing the mixture, filled LN2 cold trap full. Condensing mixture started with mixing chamber temperature at 11.1 K, and G2=682 mbar. We wish to use 400 mbar of mixture this time, and thus we want 282 mbar of mixture to remain in the dump. |
| 1630 | Closed V9 with 282 mbar in the dump. |
| 1645 | Opened V12 all the way. Mixing chamber temperature at 7 K and dropping. |
| 1855 | Mixing chamber temperature 2.1 K. Start manual circulation procedure. |
| 2335 | Reduce 1 K pot temperature to 1.6 K. Mixing chamber temperature at 56.4 mK. |
| | Fill N2 cold trap full. |