| 0015 | Mixture left in dump 336 mbar; 350 mbar (dump pressure) of mixture in fridge. Open valve V12A on IGH to 100%. Manual condensation procedure complete. Mixing chamber temperature 7.3 K and falling. |
| 0125 | Commence helium transfer. Helium liquid level 17.8%. |
| 0210 | Cease helium transfer. Helium liquid level 92.1%. |
| 1044 | Filled LN2 coldtrap full. |
| 1420 | Begin circulation procedure (V6 starts at 12.5%). Mixing chamber temperature at 1.85 K. |
| 1600 | End circulation procedure (V6 fully open). Mixing chamber temperature at 80 mK. |
| 1700 | Mixing chamber temperature stabilized to 60.8 mK. Reduced 1K Pot temperature to 1.63 K. |
| 1825 | Mixing chamber temperature stabilized at 57.1 mK. Begin still heater tests. |
| | Noticed that G2 has stabilized around 73 mbar and G1 has stabilized around 56 mbar, suggesting that the current cold trap in use (cold trap 1) is dirty. |