| 0405 | Mixing chamber temperature has gradually increased over the last three hours. Turn on helium gas to pressurise dewar and fill main bath with liquid helium. |
| 0435 | Helium transfer complete. Helium liquid level 43.0%. Continue to evacuate IVC. |
| 2130 | Fill N2 cold trap full. |
| | Mixing chamber temperature 10.8 K. IVC pressure 2.2E-6 mbar. Start 1 K pot, temperature 1.75 K. |
| 2230 | Pump mixture into dump in preparation for condensation. |
| 2345 | Pressure of mixture in dump 686 mbar. Adjust needle valve to stabilise 1 K pot temperature at 1.85 K. Commence manual condensation procedure through nitrogen cold trap 1. |