| 1100 | Filled LN2 coldtrap full. |
| 1130 | Begin evacuating IVC. |
| 1700 | Blowing out Nitrogen. Pressure in IVC 4.6E-6 mbar. Leak check with background rate at 8.6E-10 mbarl/s. |
| 1801 | Pump mixture to dump in preparation for throughput test. Leak test results in He leak rate of 1.7E-9 mbarl/s. No gross leak. |
| 1840 | Throughput test results in rate of 11 mbar/min. Leak rate during test did not change from 3.4E-9 mbarl/s. No sign of leak. |
| 1901 | Final leak check showed no increase from 3.4E-9 mbarl/s background rate when He gas was pumped into main bath. No gross leak detected. Gas was then pumped out of the main bath. |
| 1910 | Evacuate 1 K pot. Leave main bath to evacuate overnight. |
| 2150 | Commence cryocleaning mixture through nitrogen cold trap 1. |
| 2250 | Fill N2 cold trap full. |