| 1126 | Leak checker turned on. IVC Pressure at 1.4E-4 mbar. |
| 1330 | Leak check performed on IVC flanges with background rate of 1.74E-9 mbarl/s. No spikes occurred to suggest a leak. Rate rose steadily to 1.9E-9 mbarl/s during the test, though this is likely due to the overall increase in He background and not due to a leak. |
| 1745 | Dewar raised, evacuated main bath and filled with He to perform a leak check with background rate of 1.6E-9. No leak detected. Filled IVC with 4.6 mbar Nitrogen exchange gas. Started N transfer. |
| 1933 | Perform electrical checkout S11C. |
QET A to return: 242.4 Ω
QET B to return: 772 Ω
QET C to return: 731 Ω
QET D to return: 314 Ω
Qi to Qo: 142.5 kΩ
Qo to Qi: 127.6 kΩ
LED1 (to chassis): 746 kΩ: 1.055 V: <0.3 nS
LED2 (to chassis): 743 kΩ: 1.056 V: <0.7 nS
| 1955 | Nitrogen transfer level meter reads 1.3 kΩ. Cease Nitrogen transfer. |
| 2215 | Fill LN2 cold trap full, begin cryocleaning mixture through cold trap 1. |