| 1130 | Filled LN2 cold trap full. |
| 1225 | Mixture has been cryocleaning through cold trap 2 all night. Flow had stopped by morning so V6 was opened further and cyrocleaning was resumed for an hour. Mixture was then pumped to the dump with G2=550.5 mbar. |
| 1331 | Although it was expected that cold trap 2 (which is presumed to have a leak) would make the mixture dirty, G2=696.5 mbar after all mixture has been pumped to the dump (G1=0.02 mbar and P1=0.005 mbar), suggesting that there is not a leak around cold trap 2. Simply baffling. |
| 1355 | Begin cryocleaning mixture through cold trap 1. |
| 1525 | MC = 187.697K, Pressure in IVC = 1.6e-5 mbar |
| 1540 | Started Nitrogen transfer. |
| 1636 | Isolate IVC to prepare for infusion of Nitrogen exchange gas if we need it. |
| 1730 | Stopped Nitrogen transfer. Attached ping-pong ball. |
| 1816 | Added 1.0 mbar Nitrogen exchange gas. Temperature is currently at 186 K. |
| 2200 | Fill N2 cold trap full. |