2013/08/11

2100 Finish soldering and cleaning PCBs.
Perform electrical check: all traces bar three pass continuity check. Two of those affected are the unrepaired QET A Return 5 & QET D Return 2 traces. The third is QET C Return, which has been sacrificed to carry Feedback Coil C.
Although PCB on warm end appears to sit snuggly in ebox feedthrough on vacuum side, it would be safer to also use screws to ensure a good connection is maintained throughout the run. Additionally, standoffs should be purchased to fasten the stripline to the PCB using its jackscrews. These parts shall be ordered tomorrow (Monday) for delivery on Tuesday.