Table of Contents
2013/07/04
| 0057 | Switched helium dewars.(Dewar #5) Helium in MB at 69%. |
|---|---|
| 0107 | Finished helium transfer. MB at 95.9%. |
| 1230 | Used break in data collection to fill LN2 coldtrap full. Currently: G1=69.1 mbar, G2=70.9mbar, 1KPot=1.593K, and Lakeshore/MC=70.5839K. |
| 2001 | Filled LN2 coldtrap full. |
+/- 1V
* total exposure time: 60 minutes
* OR trigger on Qi and Qo channels (32/28 ADC bins for Dib 1/2)
* Am_241 and Pb_210 sources installed on side 2.
-/+ 1V
* total exposure time: 60 minutes
* OR trigger on Qi and Qo channels (32/28 ADC bins for Dib 1/2)
* Am_241 and Pb_210 sources installed on side 2.
+/- 1.5V
* total exposure time: 60 minutes
* OR trigger on Qi and Qo channels (32/28 ADC bins for Dib 1/2)
* Am_241 and Pb_210 sources installed on side 2.
-/+ 1.5V
* total exposure time: 60 minutes
* OR trigger on Qi and Qo channels (32/28 ADC bins for Dib 1/2)
* Am_241 and Pb_210 sources installed on side 2.
+/- 2V
* total exposure time: 60 minutes
* OR trigger on Qi and Qo channels (32/28 ADC bins for Dib 1/2)
* Am_241 and Pb_210 sources installed on side 2.
-/+ 2V
* total exposure time: 60 minutes
* OR trigger on Qi and Qo channels (32/28 ADC bins for Dib 1/2)
* Am_241 and Pb_210 sources installed on side 2.
+/- 3V
* total exposure time: 60 minutes
* OR trigger on Qi and Qo channels (32/28 ADC bins for Dib 1/2)
* Am_241 and Pb_210 sources installed on side 2.
-/+ 3V
* total exposure time: 60 minutes
* OR trigger on Qi and Qo channels (32/28 ADC bins for Dib 1/2)
* Am_241 and Pb_210 sources installed on side 2.
+/- 3.5V
* total exposure time: 60 minutes
* OR trigger on Qi and Qo channels (32/28 ADC bins for Dib 1/2)
* Am_241 and Pb_210 sources installed on side 2.

























