| 1030 | Filled LN2 coldtrap full. |
| 1050 | Stopped flashing on LEDs. |
| 2000 | Began helium transfer (16.1%). |
| 2100 | Finished helium transfer (90.7%). |
| 2340 | Mixing chamber temperature is very erratic. Tried to reduce pressure of main bath, which intially caused temperature to spike at 108 mK before falling again. After replacing bung once mixing chamber temperature dropped below 80 mK, temperature continued to fall until 77 mK before rising to spike above 200 mK. Temperature at 130 mK currently, and falling. Hopefully this is the last of the fluctuations. |