| 0040 | Fill N2 cold trap full. |
| 1025 | Began pumping out exchange gas. Temp at 19.2K. |
| 1030 | Filled N2 cold trap. |
| 1243 | Began pumping mixture to dump. |
| 1448 | Close V6. G1 reads 0.5mbar and G2 reads 697.2mbar. |
| 1439 | Close all valves on IGH and check that gate valve and condenser line speedivalve are closed. Open valves, 11B 7, 2A, and 5A to open cold trap 2 to He4 pump. Remove cold trap 2 from LN2 bath. Now G2 is fluctuating around 695.5mbar but doesn't seem to be decreasing. Hopefully there isn't a leak in the IGH. |
| 1540 | Finished first round of cold trap 2 cleaning. |
| 1627 | Finished second round of cold trap 2 cleaning. |
| 1710 | Finished final round of cold trap 2 cleaning. |
| 1742 | Returned cold trap 2 to LN2 bath and filled bath full.G2 at 701.2mbar. |
| 1749 | Begin cryocleaning mixture. Initially G1 at 541.1mbar and G2 at 503.4mbar. |
| 1859 | Pump mixture to dump. |
| 1919 | Started the 1K pot. Started manual condensation. |
| 2150 | Dump pressure at commencement of condensation procedure 700 mbar. Current dump pressure 347 mbar. Therefore, 353 mbar of mixture in mixing chamber lines. Isolate dump by closing valve V9 on IGH. Open valve V13A on IGH: pressure in G1 looks fine (ie. <200 mbar). Leave valve V13A on IGH open and monitor situation. |
| 2300 | Open valve V12A on IGH to 100%, cease manual condensation procedure. |
| 2325 | Fill N2 cold trap full. |