| 1040 | Pressure in dewar: 8.6E-5 mbar. Stopped evacuating dewar. |
| | Reconnected the pumping manifold to the turbo pump, scroll pump, and leak checker. Pumped out the manifold with the scroll pump. |
| | Turned opened the turbo pump to the manifold, closed and turned off the scroll pump, and opened the valves to the IVC. |
| 1200 | Vacuumed out the inside of the dewar and tightened the indium seals. |
| 1250 | Began spray test on indium seals. Original background at 6.21E-9 mbar*l/s. Background fluctuated and increased during test, reaching a maximum value of 7.04E-9 mbar*l/s on the bottom flange. This is most likely due to the increasing He background and not because of a leak. There were no leak rate spikes and the increase was consistent and gradual. No leaks found. |
| 1600 | Pressure in IVC: 1.2E-4 mbar. |
| 1636 | Ran a leak check of the indium seals. Background leak rate was 4.3E-9 mbar l/s. Overpressurized the main bath with helium. Leak rate did not change. |
| 1737 | Filled IVC with 4.6 mbar of nitrogen exchange gas. |
| 1800 | Began liquid nitrogen transfer. |
| 2000 | Nitrogen liquid level meter reads 1.33 kΩ. Nitrogen transfer complete. Attach ping-pong ball. |