2013/06/06

1200 Completed tower assembly and electrical check. Electrical check produced mostly expected results except that conductance values for LED 2 on Dib 2 continue to increase, when it should be below 0.1 nS.
+ Lead - Lead Dib 1 value Dib 2 value
1 2 open open
2 4 open open
3 4 open open
4 6 open open
5 6 open open
6 8 open open
7 8 333 Ohms 342 Ohms
2 8 open open
Chassis 9 (RF) 769 kOhms 786 kOhms
Chassis 9 (VF) 1.103 V 1.106 V
9 Chassis < 1 nS < 1 nS
Chassis 10 (RF) Open 780 kOhms
Chassis 10 (VF) Open 1.109 V
10 Chassis) < 1 nS < 1 nS
7 11 25 nS 26 nS
12 11 < 1 nS < 1 nS
12 13 25.5 nS 26 nS
7 14 26 nS 26 nS
15 14 < 1 nS < 1 nS
15 16 25.5 nS 26 nS