| 1325 | Turned on leak checker (in the morning). Opened leak checker to fridge lines. Background rate has settled to: 9.7E-7 mbar*l/s. |
| 1331 | Leak rate: 9.57E-7 mbar*l/s. When the syringe was opened but not directed at any flanges or holes, the leak rate rose to 1.1E-6 mbar*l/s. |
| | Syringe placed in ballast hole with helium flowing. Leak rate lowered to 9.57E-7 mbar*l/s. |
| 1336 | Leak rate has risen to 1.34E-6 mbar*l/s. |
| 1342 | Leak rate ~ 4.1E-6 mbar*l/s. Leaving syringe in the hole and waiting to see how quickly rate rises over half an hour. |
| 1356 | Leak rate ~ 3E-5mbar*l/s. |
| 1400 | Closed off syringe and pulled it out of ballast hole. |
| 1410 | Leak rate maxed out to 6.03E-5 mbar*l/s. |
| 1841 | Background leak rate is 1.21E-6 mbar*l/s. Cover the back of the pump with plastic and insert syringe into back of pump. |
| 1856 | Leak rate reached 3E-5 mbar*l/s. |
| 1901 | Turn of He gas supply. |
| 1915 | Leak rate maxed out to 9.2E-5 mbar*l/s. |
| 1924 | Fed Cricket 4 pellets. |