| 1133 | Mixing chamber temp: 60.8 mK. G1 ~ 85.3 mbar, G2 ~ 80.2 mbar. P1 ~ 0.085 mbar. 1 K pot temperature: 1.728 K. |
| 1411 | Begin flashing detector for 20 minutes, then cool down for 1 hour. Take one 30 min series at + 4 V for Dib 2. Trigger for Qi channel. |
| 1508 | Hook up leak checker to vent in back of IGH. Turn on. Currently G1:86.1mbar, G2:81.4mbar, P1:0.085mbar, P2:50.0mbar, 1K Pot: 1.731K. |
| 1512 | Switch to exhaust. Pause pumping on 1K Pot by closing 4A, then open 5A and 2A to pump on vent, open V7. P2 at 0.016mbar. |
| 1514 | Open vent speedivalve to pump on line to leak checker. P2 maxed at ~25mbar and stopped at 0.02mbar. Once line is evacuated close V2A and 5A, open 4A to continue pumping on 1K pot and switch back to recovery. |
| 1535 | Calibrate leak checker take background rate (Settled to 1.1E-10 mbarl/s by 15:45). |
| 1548 | Open leak checker to line. Leak rate eventually settled to 3.4E-8mbarl/s by 16:20. At this point we decided to warm up the cold trap before performing leak check. |
| 1628 | Close vent speedivalve and isolate leak checker. At this point G1:87.8mbar, G2:80.1mbar, P1:0.085mbar, P2:50.0mbar, 1K pot: 1.732K. |
| 1632 | Switch to exhaust, close 4A (isolate 1K pot), open V5A, 2A, 11A and remove cold trap 1 from LN2. |
| 1635 | Open V4A to pump on both 1K pot and cold trap 1. |
| 1717 | Open leak checker to vent (vent speedivalve is closed). Leak rate at 4.6E-9mbarl/s. |
| 1729 | After waiting for cold trap 1 to reach room temp, leak rate has reached 4.1E-9mbarl/s. Close V5A and V2A, and switch back to recovery. |
| 1731 | Open vent speedivalve, allowing leak checker to pump on cold trap 1. Leak rate climbed to 1E-1mbarl/s. Closed vent speedivalve. Panic sets in. Although we had been pumping on it with the He4 pump, there was enough stuff present in the “clean” cold trap 1 to overwhelm the leak checker. Perhaps this is a sign of a leak, or perhaps the cold trap is haunted. |