| 0031 | Returned cold traps to respective baths. |
| | Open V1 and V6 and gate/ condenser valves to continue pumping on the fridge lines to the dump. |
| 0920 | Filled LN2 cold trap. |
| | Fed Cricket 4 pellets. |
| 1120 | Start cryocleaning the mixture through the nitrogen cold trap 2. |
| 1400 | Pumped mixture to dump. |
| 1540 | Begin LHe transfer (5.0%). |
| 1615 | End LHe transfer (90.5%). |
| 1650 | Isolated the mixture in the dump. Started pumping on the 1K pot. Started the He recovery system. |
| 1720 | Opened Gate valve, condenser line speedivalve, cold trap 1 speedivalve, V1, V3, and V13. G1 currently at 56mbar and G2 at 190mbar (beginning condensing process.) |
| | Filled LN2 cold trap. |
| 2052 | Closed V3, begin circulating mixture. |
| 2110 | Fed Cricket 4 pellets. |
| 2120 | Finished automated circulation sequence. G1:84.9, G2:96.1, currently at 89.1mK and falling. |