| 1120 | Mixing chamber temperature is ~ 715 mK, and G1 and G2 were 600, 650 mbar respectively. |
| 1125 | Closed Gate and Condenser valves. Closed V13A and opened V5. The pressure in G2 rose up to 800 mbar pretty quickly, so V9 was opened as well. Re-opened gate and condenser valves. |
| | Pumping everything to dump. It's probably best to clean the mixture before trying to re-circulate. |
| 1155 | The pressure in G2 is not increasing very much. |
| | Fed Cricket 4 pellets. |
| 1226 | Stopped 1 K pot and He recovery. |
| 1545 | Begin LHe transfer (7.0%). |
| 1630 | End LHe transfer (90.2%). |
| 1755 | Fed Cricket 4 pellets. |
| 2250 | Filled LN2 coldtrap full. |
| 2250 | G102 pressure = 608.5 MC thermometer = 1.03K |