| 0020 | Finished 3 rounds of cleaning cold traps. |
| 0111 | Close all valves on IGH. |
| 0118 | Filled LN2 cold trap. |
| 0128 | Return cold traps to respective baths. |
| 0131 | Start 1 K pot and helium recovery. |
| 0141 | Open gate and condenser valves. Open V1, V13A, and V12A. Open V6 gradually. |
| 0218 | V6 opened all the way. |
| 0545 | Base temperature has stabilized to 57.8 mK. |
| 1010 | Fed Cricket 4 pellets. |
| 1014 | Filled LN2 cold trap. |
| 1040 | Begin LHe transfer (17.5%). |
| 1135 | End LHe transfer (94.7%). |
| 1145 | Re-powered boards. They seem fine. |
| | G1 and G2 are increasing at a creeping rate. This seems to be standard behavior, and unfortunately there's not really an indication when all of a sudden the blockage develops. |
| 1340 | Around 1320, the temperature of the mixing chamber spiked, even though G1 and G2 seemed okay. The temperature increased to ~ 116 mK before we unplugged the boards. This may or may not have helped to lower the temperature. There weren't significant vibrations felt in the main bath, but upon unplugging the transfer port, the temperature dropped dramatically. Mixing chamber temperature is at 76 mK and dropping. |
| 1721 | Begin flashing detector for 1 hour, then cool down for 2 hours. Take three 30 min series at +/- 3 V for Dib 1/2, and then three 30 min series at -/+ 3 V for Dib 1/2. 6 seconds of flashing and 20 min cool down between each series. OR trigger for Qi channels (35 / 30 ADC bins for Dib 1/2 respectively) . Ba-133 source is out. |
| 1807 | Fill LN2 cold trap full. |
| 1808 | Fed Cricket 4 pellets. |