2013/03/09
| 1020 | Mixing chamber temperature 80.2 K. Commence pumping out of exchange gas. |
|---|---|
| 1025 | Fill N2 cold trap full. |
| 1200 | Conduct electrical check at 80 K. Worryingly Qi & Qo biases to QET Returns on DIB 1 were open, however panic subsided after the same result was determined for DIB 2: it is likely that the crystal is no longer conducting. It is a little unusual, but a far more likely explanation than all four bias channels failing on different striplines/DIBs. QET C to QET A/D Returns looks fine, so we should be in business. |
| We have lost LED 1 on DIB 1: trace 38 on the stripline. Traces 36 & 37 correspond to Feedback C & Feedback C Return respectively, which was found to be open. It is possible that both of these traces were severed. Trace 39 corresponds to third QET D Return line, which is still intact. It is likely that this will be the next to fail. We should be able to survive with the two LEDs on DIB 2. | |
| Damage report: we've lost FET card pins 1-4; 14-16; 27; 29-32; 39-40; and 42-44. Pins 28 & 41 (Feedback A & Feedback A Return respectively) are hanging on by a thread, so we can assume they have also been lost. These FET card pin numbers correspond to stripline traces 19-25 & 27-38. Trace 26 (QET B) is holding on, but is expected to fail. Interestingly, Feedback D (FET card pin 17, stripline trace 17) was found to be severed during room temperature checks with a resistor. | |
| The next traces in danger are 15 (SQUID C Return), 16 (QET C), 17 (Feedback D Return), 18 (Feedback D), 39 (QET D Return 3) & 40 (Qo source). If we lose Qo source, we lose the ability to read out that channel. However, we can probably live without it, as long as we can still bias the electrodes. Losing QET C is not a huge problem, but a slight one nonetheless - we would be prevented from checking whether the QET A Returns or QET D Returns are still intact. |
| Detector: | G101b DIB1 | BH: | Stripline: | 21 | ||||
| SC: | ZB1-1-6 | 300 K | 80K | |||||
|---|---|---|---|---|---|---|---|---|
| Face: | 2 | Date | 2012-03-07 | Date | 2012-03-09 | |||
| SQUET: | ZC70 | Who | HC | Who | HC | |||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis | Nominal | Actual | Chassis |
| (Gnd lead) | (Gnd lead) | |||||||
| Nominal: | Nominal: | |||||||
| < 0.1 nS | < 0.1 nS | |||||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | open | OK | 1 - 2 k | open | OK |
| SQUID bias B/Ret | 19 | 34 | 4.4k | OK | open | OK | ||
| SQUID bias C/Ret | 8 | 24 | 4.7k | OK | 1.8k | OK | ||
| SQUID bias D/Ret | 23 | 39 | 5.2k | OK | open | OK | ||
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 29k | OK | 9 - 13 k | 2.2M | OK |
| Feedback B/Ret | 2 | 18 | 25k | OK | open | OK | ||
| Feedback C/Ret | 41 | 25 | 28k | OK | open | OK | ||
| Feedback D/Ret | 22 | 6 | 35k | OK | 17k | OK | ||
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 166,151,145,149,147 | OK | 30 - 40 | open | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 84,83,97,83 | OK | 42,41,56,42 | OK | ||
| QET C/Ret | 7 | 5, 9, 10, 28 | 157,85,76,85 | OK | open,46,37,46 | OK | ||
| QET D/Ret | 38 | 36, 40, 43, 44 | 93,90,89,90 | OK | open | OK | ||
| QET C/QET A Ret | 7 | 1, 13, 14, 17, 32 | 110,93,88,91,89 | open,52,47,51,48 | ||||
| QET C/QET D Ret | 7 | 36, 40, 43, 44 | 90,87,86,87 | open,open,46,47 | ||||
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.07k | OK | 1.0 - 1.1 k | 1.04k | OK |
| Qi bias/QET Ret | 15 | 24 - 26 nS | open (B); 26 (A,C,D) | OK | < 1 nS | OK | OK | |
| Qo bias/QET Ret | 11 | open (B); 26 (A,C,D) | OK | OK | OK | |||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 23,23 | OK | 6 - 8 nS | 20,20 | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | 23,23 | OK | 21,21 | OK | ||
| Qi drain | 16 | chassis | < 0.1 nS | – | OK | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | – | OK | ||
| Qi source | 31 | chassis | – | OK | – | OK | ||
| Qo source | 27 | chassis | – | OK | – | OK | ||
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | 0.715 | OK | 0.9 - 1.0 V | 1.094 | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.135 | – | 1.2 - 1.5 V | open | – |
| LED 2 | 26 | chassis | open | – | open | – | ||
| Isolation Checks | ||||||||
| QET C/Feedback D | 18 | 17 | <0.1 nS | OK | – | OK | ||
| QET C/SQUID bias D | 18 | 30 | OK | – | OK | |||
| QET D/Feedback D | 29 | 17 | OK | – | OK | |||
| QET D/SQUID bias D | 29 | 30 | OK | – | OK | |||
| QET A Ret/QET B Ret | 1, 13, 14, 17, 32 | 29, 33, 47, 48 | OK | – | OK | |||
| QET A Ret/Qi feedback | 1, 13, 14, 17, 32 | 38 | OK | – | OK | |||
| QET A Ret/Qi drain | 1, 13, 14, 17, 32 | 25 | OK | – | OK | |||
| QET D Ret/QET B Ret | 36, 40, 43, 44 | 29, 33, 47, 48 | OK | – | OK | |||
| QET D Ret/Qi feedback | 36, 40, 43, 44 | 38 | OK | – | OK | |||
| QET D Ret/Qi drain | 36, 40, 43, 44 | 25 | OK | – | OK | |||
| Detector: | G101b DIB2 | BH: | Stripline: | 19 | ||||
| SC: | ZB1-1-9 | 300 K | LN | |||||
|---|---|---|---|---|---|---|---|---|
| Face: | 5 | Date | 2013-03-07 | Date | 2013-03-09 | |||
| SQUET: | ZC23 | Who | HC | Who | HC | |||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis | Nominal | Actual | Chassis |
| (Gnd lead) | (Gnd lead) | |||||||
| Nominal: | Nominal: | |||||||
| < 0.1 nS | < 0.1 nS | |||||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.4k | OK | 1 - 2 k | 1.6k | OK |
| SQUID bias B/Ret | 19 | 34 | 5.0k | OK | 2.0k | OK | ||
| SQUID bias C/Ret | 8 | 24 | 4.6k | OK | 1.7k | OK | ||
| SQUID bias D/Ret | 23 | 39 | 4.3k | OK | 1.6k | OK | ||
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 18k | OK | 9 - 13 k | 7.3k | OK |
| Feedback B/Ret | 2 | 18 | 20k | OK | 8.3k | OK | ||
| Feedback C/Ret | 41 | 25 | 19k | OK | 7.6k | OK | ||
| Feedback D/Ret | 22 | 6 | 18k | OK | 7.1k | OK | ||
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 90,91,85,89,86 | OK | 30 - 40 | 51,50,45,48,46 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 87,86,100,86 | OK | 46,45,60,46 | OK | ||
| QET C/Ret | 7 | 5, 9, 10, 28 | 85,85,75,85 | OK | 45,45,34,44 | OK | ||
| QET D/Ret | 38 | 36, 40, 43, 44 | 86,84,84,84 | OK | 47,44,44,44 | OK | ||
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.07k | OK | 1.0 - 1.1 k | 1.04k | OK |
| Qi bias/QET Ret | 15 | 24 - 26 nS | open (A,B,C); 26 (D) | OK | < 1 nS | OK | OK | |
| Qo bias/QET Ret | 11 | open (A,B,C); 25 (D) | OK | OK | OK | |||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 23,23 | OK | 6 - 8 nS | 20,20 | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | 23,23 | OK | 20,20 | OK | ||
| Qi drain | 16 | chassis | < 0.1 nS | – | OK | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | – | OK | ||
| Qi source | 31 | chassis | – | OK | – | OK | ||
| Qo source | 27 | chassis | – | OK | – | OK | ||
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | 0.725 | OK | 0.9 - 1.0 V | 1.092 | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.137 | – | 1.2 - 1.5 V | 1.414 | – |
| LED 2 | 26 | chassis | 1.13 | – | 1.404 | – | ||
| 1400 | Fed Cricket 4 pellets. |
|---|---|
| 1545 | Pressure in IVC 1E-6 mbar. Isolate turbo pump to prepare for leak check during nitrogen blowout. Background helium leak rate 1.6E-9 mbar l/s. Start blowing nitrogen out of main bath. |
| 1630 | Helium cylinder expired. Replaced it. |
| Pump mixture into dump in preparation for throughput test. | |
| 1705 | Nitrogen has been removed from main bath. Helium leak rate rose to 9.5E-9 mbar l/s, but rise was gradual so looks like background. Therefore, no gross leak. |
| 1720 | Background helium leak rate 1.5E-8 mbar l/s. Evacuate main bath and overpressurise with helium gas. No change in helium leak rate indicates no gross leak. |
| Evacuate 1 K pot. | |
| 1730 | Throughput test yields 32 mbar/min: good enough. Helium leak rate does not change from background level of 1.5E-8 mbar l/s indicating no gross leak from mixing chamber lines into IVC. Pump mixture into dump. |
| Isolate leak checker. Resume evacuating IVC with turbo pump. | |
| 1745 | Fill IVC with 0.046 mbar He-4 exchange gas. |
| 1802 | Begin long He transfer (0%). |
| 2225 | Close condenser line speedivalve and gate valve to isolate fridge. Close all valves on IGH to seal off dump. Open path from nitrogen cold traps to He-4 pump. Pull nitrogen cold traps out of bath and evacuate with He-4 pump in preparation for cleaning. |
| 2250 | Start cleaning nitrogen cold traps: 1 cycle should suffice. |
| 2310 | Finished 1 cycle of cold trap cleaning. Leave traps to evacuate and cool down. |
| Fed Cricket 3 pellets. | |
| 2355 | Mixing chamber temperature 7 K. Pump He-4 exchange gas out of IVC. |
| Stop evacuating nitrogen cold traps and place them back in their liquid nitrogen bath to cool down before resuming mixture cryocleaning. |