UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20130223

2013/02/23

0750 Mixing chamber temperature 83 K. Start pumping out nitrogen exchange gas.
0940 Fill N2 cold trap about a litre shy.
1415 Stop evacuating IVC in preparation for nitrogen blowout. Mixing chamber temperature 81 K.
Background helium leak rate in IVC 1.1E-9 mbar l/s. Start nitrogen blowout.
1500 Pump mixture into dump in preparation for throughput test.
1540 Cease nitrogen blowout. Helium leak rate 6.9E-9 mbar l/s: no gross leak.
1635 Evacuate and flush main bath with helium gas. Background helium leak rate 1.1E-8 mbar l/s. No change after filling main bath with helium gas: no gross leak.
1637 Evacuate 1K pot.
1650 Throughput test yields 18 mbar/min: too low. Pump mixture into dump to make another attempt.
Background helium leak rate 1.1E-8 mbar l/s. No change after throughput test: no gross leak between mixing chamber lines and IVC.
1655 Isolate leak checker and evacuate IVC with turbo pump.
1705 Throughput test yields 14 mbar/min. We know that throughput test can give varying values. It is hard to believe that the mixture is not clean yet as it has been cryocleaned overnight. There may be a blockage in the mixing chamber lines, but they have been evacuated for at least a day. One worrying possibility is a hard block, but there is no reason one could have formed. Let's change operator.
1720 Throughput test yields 40 mbar/min: much better. Pump mixture into dump.
1806 Electrical check at 77K complete. On Dib 1 the problems with QETA/Ret and QETB/Ret are back, but additional problems have arisen: SQUID bias A, B, and D to return are open, and Feedback A and B are open. The other two dibs are okay.
1844 Begin slow LHe transfer (0%).
2245 Fed Cricket 4 pellets.