| 1015 | Filled LN2 cold trap. |
| 1050 | Fed Cricket 4 pellets. |
| 1120 | Finished tightening IVC flange. |
| 1143 | Performed leak check. Background at 1.42E-9 mbar l/s, new rate at 1.57E-9 mbar l/s. A quick check to QET A and QET D shows they are still not open. |
| 1358 | Dewar raised and screwed in. |
| 1545 | Evacuated Main Bath, filled it with Helium gas and evacuated 1KPot. The leak rate was measured at 1.8E-9 mbar l/s. No gross leak detected. Filled IVC with 5.4mbar exchange gas. |
| 1600 | Remove recovery hose and begin LN2 transfer. |
| 1630 | Filled LN2 cold trap. Start cryocleaning the mixture. |
| 1740 | End LN2 transfer. Put on ping pong ball. |
| 1809 | Fed Cricket 4 pellets. |