| 1000 | Filled LN2 cold trap. |
| 1045 | Fed Cricket 4 pellets (mommy?!) |
| 1050 | Begin taking data. First flash for 6 sec, cool down for 20 min. Dib 1/2 biased at +/- 2V, 4V, 6V, 8V, 10V, 12V. At each bias there is a 30 min series, followed by 6 seconds of flashing and 20 minutes of cool down. End with 30 min of flashing, 30 min of cool down. Trigger on Qi/Qo on Dib 2 only at 40 ADC bins, respectively. |
| 1350 | Interrupted data taking (after 6 V) and circulation because pressures in G1 and G2 rose to 190, 170 mbar respectively and still increasing at ~ 1 mbar / min. Going to clean cold traps. |
| | Closed gate and condenser valves. |
| | Closed V13A. Opened V5. |
| 1620 | Closed off all valves on IGH. Stopped 1 K pot. Pulled out cold traps. Opened line between He-4 pump and cold traps. Begin pumping on cold traps as they warm up. |
| 1814 | Fed Cricket 4 pellets. |
| 1816 | Finished heating cold traps three times. Waiting for them to cool down. |
| 1915 | Closed all valves on IGH. Returned cold traps to their proper places. |
| 1955 | Started 1K pot, turned on He recovery, and opened Gate and Condenser valves. |
| | Re-commence circulation by opening V1, 13A, and 12A. Opened V6 slowly until it was safe to open all the way. |
| 2119 | Mixing chamber temperature seems to be stabilizing around 50.0 mK. G1 and G2 are 45 and 42 mbar, respectively. P2 = 8.5 mbar; P1 = 0.065 mbar; 1K pot temperature ~ 1.58 K. |
| 2135 | Filled LN2 cold trap. |
| 2141 | Resume data taking from earlier. First flash for 20 min, then cool down for 60 min. Start taking data at +/- 8V, 10V, 12V. At each bias there is a 30 min series, followed by 6 seconds of flashing and 20 minutes of cool down. End with 30 min of flashing, 30 min of cool down. Trigger on Qi/Qo on Dib 2 only at 40 ADC bins, respectively. End with 30 min of flash and cool down. |