| 1000 | The DAQ program didn't finish taking data properly. The files are there, but the quitting process had an error. Had to force quit the program. |
| 1007 | Begin flashing detector on Dibs 1 and 2 with both LEDs. |
| 1010 | Filled LN2 cold trap. |
| 1025 | Fed Cricket 4 pellets. |
| 1035 | Begin LHe transfer (15.4%). |
| 1103 | Stop flashing detector. The temperature had reached 131 mK while flashing. |
| 1140 | End LHe transfer (90.2%). |
| 1145 | Restarted LabVIEW. Ba-133 source was not clear in +/-4 V series. Maybe DAQ had something to do with it. |
| 1151 | Begin taking data 07130201_1151. Dib 1/2 biased at +/- 4V, +/-3 V, +/- 2V at 30 min each, with 6 seconds of flashing and 20 minutes of cool down in between each series. End with 30 min of flashing and 20 min of cool down. Trigger on Qi/Qo on Dib 2 only at 40 ADC bin. Using Ba-133 source. |
| 1601 | Data collection was not good. Still suspecting the switch. Stopped flashing detector. |
| 1634 | Start flashing detector again. Using different external PoE supplies but connected via switch. Qi on Dib 3 looks noisy, but I think this is to be expected. |
| 1640 | Stop flashing detector. Temperature was still increasing, but was currently at 150 mK. |
| 1230 | Filled LN2 cold trap. |