| 0945 | Filled LN2 cold trap. |
| 1000 | Fed Cricket 4 pellets. |
| 1118 | G1 and G2 seem to be running a bit high: 86 and 89 mbar, respectively. |
| 1127 | Unplugged switch completely and plugged it back in. Reconnected boards and powered them. Didn't have any trouble with the FET heater. |
| 1143 | G1 and G2 are now 91 and 93 mbar respectively. Mixing chamber temperature is 50.6 mK and slowly rising. |
| 1209 | Temperature stabilizing at 51.3 mK. |
| 1210 | Flashed LEDs on Dib 1 for 10 seconds. Board is still connected. |
| 1212 | Flashed LEDs on Dib 2 for 10 seconds. Board is still connected. |
| 1248 | FLashed LEDs on Dib 1 and 2 for 10 seconds. Made sure to go about stopping and starting flashing by having to stop and start contro vi several times to see if boards would disconnect. Boards are still connected. |
| 1303 | Zap SQUIDs on Dib 3. |
| 1323 | Should modify QET bias setting for Dib 3, Ch. B to -70 uA. |
| 1328 | Turn on mixing chamber heater to find Dib 3, Ch. B Tc's. |
| 1506 | Finish Tc measurement for Dib 3, ch. B. |
| 1720 | Begin LHe transfer (28.3%). |
| 1830 | End LHe transfer (72.2%). |
| 1835 | Fed Cricket 4 pellets. |
| 1716 | Flashed detector with both dibs. Same settings as before. Lasted for 10 seconds. |
| 1850 | Start taking Ba-133 data with 0.4096 ms trace length, SQUIDs locked but no QET bias applied, OR trigger on all charge channels at 40 ADC bins, -/+3 V bias. DIB 2 is detector 1, DIB 1 is detector 2 & DIB 3 is detector 3. |
| 1900 | Tested taking charge data. Seems to be okay. Ba-133 source is out. |
| 2150 | Stop taking Ba-133 data. |
| | Start flashing detector: LEDs 1 & 2 on DIBs 1 & 2 only; usual settings (-0.6 mA current, 100 μs flash on time, 5 ms flash off time). |