UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20130124

2013/01/24

0940 Stop flashing detector.
0956 Filled LN2 cold trap.
Fed Cricket 4 pellets.
1220 Finished charge breakdown studies between Qi and Qo on Side 1 (with side 2 grounded) where Qi has negative bias and Qo is at 0 V. No charge breakdown was detected from 0 to 13 V bias.
Flashed Dib1, LEDS 1&2, for 10 seconds. Board is still connected.
1700 Finished charge breakdown studies between Qi and Qo on Side 1 (with side 2 grounded) where Qo has negative bias and Qi is at 0 V. No charge breakdown was detected from 0 to 13 V bias.
1811 Fed Cricket 4 pellets.
1830 Begin LHe transfer (29.1%).