| 0950 | Stop flashing detector (temperature was stable at 127 mK). |
| 1002 | Filled LN2 cold trap. |
| | Fed Cricket 4 pellets. |
| 1017 | Both DCRC32 & 33 read 0000. |
| | Zapping Dib 3 now. Will re-power DCRCs and zap squids on Dibs 1 and 2. |
| 1056 | All SQUIDs have been zapped and channels have been re-locked and timing link has been reset. This is somewhat frustrating to do after flashing the detectors each time (because one or both of the DCRCs we use to flash reads 0000) because it's at least 40 minute process to go to the next step (not including the time it took to cool down from flashing). Mixing chamber temperature is 52.1 mK and still decreasing. |
| 1130 | Mixing chamber temperature: 51.4 mK. |
| 1232 | Finished charge breakdown studies between Qi and Qo on Side 2 (with side 1 grounded) where Qi has positive bias and Qo is at 0 V. At +8 V, I started to increase the bias in 0.5 V increments. At 8 and 9 V, there were very slight signs of charge breakdown on Dib 1 on channels A and D. At 9.5 V, Dib 3 Ch. C showed very slight signs, and Qo's signal on Dib 2 started to look a little worse. At 10 V there was clear charge breakdown on board 33 for ch.'s A and D (D more often). 31C (convention stands for DCRC#Channel_Letter) also showed clearer signs of charge breakdown, 31B slightly did. 32D started to show signs. |
| | Flashed Dib2, LEDS 1&2, for 10 seconds. Board is still connected. |
| 1422 | Finished charge breakdown studies between Qi and Qo on Side 2 (with side 1 grounded) where Qo has positive bias and Qi is at 0 V. No charge breakdown was detected from 0 to 13 V bias. |
| | Flashed Dib2, LEDS 1&2, for 10 seconds. Board is still connected. |
| 1543 | Finished charge breakdown studies between Qi and Qo on Side 2 (with side 1 grounded) where Qi has negative bias and Qo is at 0 V. No charge breakdown was detected from 0 to 13 V bias. |
| | Flashed Dib2, LEDS 1&2, for 10 seconds. Board is still connected. |
| | Flashed Dib1, LEDS 1&2, for 5 seconds. Board 33 is still connected. |
| 1809 | Fed Cricket 4 pellets. |
| 1848 | Finished charge breakdown studies between Qi and Qo on Side 2 (with side 1 grounded) where Qo has negative bias and Qi is at 0 V. Charge breakdown hints were detected at -11 V on 31C. At -12 V the charge breakdown was clear on channels 33 A and D (on Dib 1). Example of charge breakdown is in Figure 1. |
| 1853 | Start flashing with Dib 1, LEDs 1 & 2. |
| 1855 | This flashing seems to work. Fridge is currently at 106 mK and rising. |
| 1857 | Start flashing with Dib 2, LEDs 1 & 2. |
| | Temperature is going above 127 mK. This is a good sign. |
| 1901 | Fill LN2 cold trap. |