UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20130121

2013/01/21

1430 Fed Cricket 3 pellets.
1500 Fill N2 cold trap full.
Cease flashing detector.
2215 Initial mixing chamber temperature 51.5 mK. Measure Tcs for phonon channels on DIB 1 using 10 mVpp triangle wave at 100 Hz:
Peak-to-Peak Amplitude [mV] Tc (T increasing) [mK ± 0.2 mK] Tc (T decreasing) [mK ± 0.2 mK]
Channel Output Gain Before Transition After Transition Start Stop Start Stop
A1 3 290 19 81.2 82.1 81.7 80.9
B1 7 830 51 81.9 82.3 81.8 81.7
C1 7 700 41 79.3 81.4 81.2 78.9
D1 7 670 41 75.6 77.4 77.0 75.1
2230 Start flashing detector: LEDs 1 & 2 on DIBs 1 & 2 only; usual settings (-0.6 mA current, 100 μs flash on time, 5 ms flash off time).
2245 Fill N2 cold trap full.
Fed Cricket 4 pellets.