| 1000 | Filled LN2 cold trap. |
| | Stopped flashing detector from Dibs 1 and 2. The temperature while flashing was 127 mK. I thought it was 160 mK the day before. |
| | Fed Cricket 4 pellets. |
| 1015 | Noticed that both DCRC32 and 33 are unpowered. Not sure why this is the case. |
| 1050 | Boards are all powered. Mixing chamber temperature is 51.2 mK. Pressures in G1 and G2 are 55 mbar and 71 mbar, respectively. |
| | Now zapping SQUIDs. |
| 1414 | Begin charge breakdown tests. |
| 1817 | Fed Cricket 4 pellets. |
| 1830 | Conducted charge breakdown tests across the crystal where Dib 1 is positively biased and Dib 2 is negatively biased. No charge breakdown was detected. Hm! |
| 2000 | Flash detector for a few seconds. Wait for detector to cool. |
| 2004 | Filled LN2 cold trap. |
| 2313 | Start flashing detector. Same settings as previous days. |