UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20130112

2013/01/12

1100 Filled LN2 cold trap.
Fed Cricket 4 pellets.
1117 Pressure in G2 has lowered to 62 mbar. Mixing chamber temperature is 52.3 mK. Proceed with collecting IbIs curves. Note that DCRC32 didn't disconnect overnight!
1300 Finished Ch. D on DCRC 31/Dib3. Taking a break for the wrist/ lunch!
1527 Finished Ch. A on DCRC 32/Dib2.
1706 Fed Cricket 4 pellets.
2200 Fill N2 cold trap. Nitrogen level about a litre shy of top, but will suffice.
2320 Pressures in G1 & G2 are 50 mbar & 54 mbar respectively. Mixing chamber temperature is holding steady at 52.6 mK.