| 1100 | Filled LN2 cold trap. |
| | Fed Cricket 4 pellets. |
| 1117 | Pressure in G2 has lowered to 62 mbar. Mixing chamber temperature is 52.3 mK. Proceed with collecting IbIs curves. Note that DCRC32 didn't disconnect overnight! |
| 1300 | Finished Ch. D on DCRC 31/Dib3. Taking a break for the wrist/ lunch! |
| 1527 | Finished Ch. A on DCRC 32/Dib2. |
| 1706 | Fed Cricket 4 pellets. |
| 2200 | Fill N2 cold trap. Nitrogen level about a litre shy of top, but will suffice. |
| 2320 | Pressures in G1 & G2 are 50 mbar & 54 mbar respectively. Mixing chamber temperature is holding steady at 52.6 mK. |