| 0005 | Fill N2 cold trap full. |
| 1015 | Fed Cricket 4 pellets. |
| 1047 | Filled LN2 cold trap. |
| 1055 | G1 = 50 mbar; G2 = 71 mbar. This is a big change from yesterday where both pressures were ~ 49 mbar. |
| | Apparently DCRC32 had disconnected again. |
| 1400 | Was almost done tuning channel B on Dib3/DCRC31, and temperature started rising, which began affecting latter measurements. |
| 1430 | Begin LHe transfer (10.3%). |
| 1530 | End LHe transfer (85.6%). |
| 1744 | Fed Cricket 4 pellets. |
| 1800 | Finished IbIs curves for Ch. B and C on Dib3/DCRC31. |