2013/01/11

0005 Fill N2 cold trap full.
1015 Fed Cricket 4 pellets.
1047 Filled LN2 cold trap.
1055 G1 = 50 mbar; G2 = 71 mbar. This is a big change from yesterday where both pressures were ~ 49 mbar.
Apparently DCRC32 had disconnected again.
1400 Was almost done tuning channel B on Dib3/DCRC31, and temperature started rising, which began affecting latter measurements.
1430 Begin LHe transfer (10.3%).
1530 End LHe transfer (85.6%).
1744 Fed Cricket 4 pellets.
1800 Finished IbIs curves for Ch. B and C on Dib3/DCRC31.