2013/01/10
| 1015 | Fed Cricket 4 pellets. |
|---|---|
| Filled LN2 cold trap. | |
| 1100 | Removed DCRC 31. Installed DCRC 32 and 31 into Dib 2 and Dib 3, respectively. |
| 1115 | Powered DCRC31. Monitor temperature change. |
| 1145 | |
| 1230 | Power DCRC32 to prep tuning QET bias for Dib 3/ DCRC31. |
| Reset power for DCRC33. Zap SQUIDs. | |
| 1303 | Set up timing link. |
| 1305 | Board 32 disconnected. |
| 1311 | Reset timing link. It seems that with all boards connected that the power available should read 94 W. |
| Completed tuning of Dib 3. |
| Take IbIs measurements for Dib 3/DCRC 31/ Ch. A. |
| Table 1: DIB 1, DCRC 33 | ||||||
|---|---|---|---|---|---|---|
| Phonon Channel | SQUID Bias (micro A) | Lockpoint (mV) | Modulation Depth (mV) | QET Bias (uA) | Inverting or Not? | Comment |
| A | 91.8 | 4.96 | 5.4 | -70 | NI | |
| B | 93.8 | 4.77 | 5.4 | -85 | I | |
| C | 91.8 | 5 | 5.3 | -80 | I | |
| D | 87.9 | 3.2 | 4.9 | -60 | I | |
| Table 2: DIB 2, DCRC 32 | ||||||
|---|---|---|---|---|---|---|
| Phonon Channel | SQUID Bias (micro A) | Lockpoint (mV) | Modulation Depth (mV) | QET Bias (uA) | Inverting or Not? | Comment |
| A | 56.6 | 4 | 4 | -70 | NI | |
| B | 88 | 4 | 4.5 | -75 | NI | |
| C | 90 | 5.3 | 5.5 | -650 | I | |
| D | 88 | 5 | 5 | -60 | NI | |
| Table 3: DIB 3, DCRC 31 | ||||||
|---|---|---|---|---|---|---|
| Phonon Channel | SQUID Bias (micro A) | Lockpoint (mV) | Modulation Depth (mV) | QET Bias (uA) | Inverting or Not? | Comment |
| A | 80.1 | 4 | 4.9 | -50 | NI | |
| B | 68.4 | 3.2 | 4 | -50 | I | |
| C | 78.1 | 4.2 | 4.5 | -40 | NI | |
| D | 80.1 | 3 | 4.6 | -70 | I | |