2013/01/02
| 1010 | Fed Cricket 4 pellets. |
|---|---|
| 1042 | Evacuate line leading up to IVC. |
| Filled LN2 cold trap. | |
| 1050 | Pressure in line is 2.2E-5 mbar. Open turbo pump up to IVC. |
| 1305 | Closed V6. |
| 1312 | Closed all valves on IGH, gate and condenser valve. |
| Closed vent valve on back of IGH. | |
| 1336 | Closed needle valve. Ensured all routes to dump are closed. Opened V11A/B, 7, 2, 1, 2A, and 5A. Reaffirming that the dump is protected, turned on He-4 pump. |
| 1730 | Fed Cricket 4 pellets. |
| Finished three rounds of cleaning the cold traps. |