2013/01/02

1010 Fed Cricket 4 pellets.
1042 Evacuate line leading up to IVC.
Filled LN2 cold trap.
1050 Pressure in line is 2.2E-5 mbar. Open turbo pump up to IVC.
1305 Closed V6.
1312 Closed all valves on IGH, gate and condenser valve.
Closed vent valve on back of IGH.
1336 Closed needle valve. Ensured all routes to dump are closed. Opened V11A/B, 7, 2, 1, 2A, and 5A. Reaffirming that the dump is protected, turned on He-4 pump.
1730 Fed Cricket 4 pellets.
Finished three rounds of cleaning the cold traps.