| 0205 | Fill N2 cold trap full. |
| 0245 | IVC pressure 8.6E-7 mbar. Background helium leak rate 2.2E-9 mbar l/s. Start blowing nitrogen out of main bath. |
| 0410 | Nitrogen blown out of main bath. Helium leak rate rose to 1.2E-8 mbar l/s, but rate of increase consistent with that expected from background: no gross leak. |
| 0440 | Evacuate main bath and overpressurise with helium gas. Background helium leak rate 2.1E-8 mbar l/s. Leak rate remains unchanged when main bath overpressurised. |
| | Isolate leak checker and evacuate IVC with turbo pump. |
| 0510 | Mixing chamber tempreature 78.5 K. Electrical check shows no problems apart from 20 nS conductivity in reverse direction for LED 2 on DIB 3. |
| 0842 | Filled LN2 cold trap. |
| 0950 | Fed Cricket 4 pellets. Bye guys! |
| 1010 | Bye Allison! Pump mixture into dump in preparation for throughput test. |
| | Evacuate main bath as precaution - probably unnecessary. |
| 1110 | Pressure in IVC 6.3E-7 mbar. Open valve to leak checker and isolate turbo pump. Background helium leak rate 3.5E-9 mbar l/s. Open gate valve condenser line speedivalve to facilitate throughput test: 45 mbar/min; fine. No change in helium leak rate. Pump mixture to dump. |
| | Background helium leak rate 3.6E-9 mbar l/s. Overpressurise main bath with helium gas. No change in helium leak rate. |
| | Isolate leak checker and evacuate IVC with turbo pump. |
| 1137 | Pressure in IVC: 8.6E-7 mbar. |
| | Filled IVC with 4E-2 mbar of He exchange gas. |
| 1200 | Started LHe transfer. |
| 1826 | Pump out He exchange gas just under 10 K. |
| 2104 | Apply external He gas pressure to dewar. |
| 2145 | End LHe transfer (91.3%). |
| 2159 | Filled LN2 cold trap. |
| | Closed gate and condenser valve. |
| | Restart cryocleaning mixture. |