UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20121217

2012/12/17

0030 Raise dewar. Evacuate main bath and overpressurise with helium gas. Background helium leak rate 2.5E-9 mbar l/s. Helium leak rate rises to 2.7E-9 mbar l/s - rate of rise that expected from background: no gross leak.
Evacuate 1 K pot.
Fill N2 cold trap full. Cease pumping contents of mixing chamber to dump, close gate valve & condenser line speedivalve. Start cryocleaning mixture through nitrogen cold trap 2.
0110 Fill IVC with 5.4 mbar nitrogen exchange gas. Start nitrogen transfer.
0250 Performed quick electrical check. LED 2 on DIB 3 still closed in reverse direction. However, LED 1 on DIB 3 yields conductivity <1 nS in reverse direction and whatever problem was aflicting Qo bias to QET return on DIB 2 has disappeared. Mixing chamber temperature 247 K and falling.
0330 Nitrogen level meter resistance 1.33 kΩ. Nitrogen transfer complete. Attach ping-pong ball.
0510 Fill N2 cold trap full.
1000 Fed Cricket 4 pellets.
1015 Filled N2 cold trap full.
1728 Fed Cricket 4 pellets.
2015 Mixing chamber temperature 79.8 K. Start pumping nitrogen exchange gas out of IVC.