| 1010 | Fed Cricket 3 pellets. |
| 1015 | Filled LN2 cold trap. |
| 1200 | Closed recovery valve on wall. |
| | Turn off mixing chamber heater. |
| 1352 | Turned on leak checker, and calibrated. |
| | Evacuated main bath. |
| | Background leak rate: 4.0E-9 mbar l/s. |
| | IVC leak rate spiked to ~ 2E-6 mbar l/s. Slowly decreasing. |
| 1417 | Filled main bath with helium gas. Inserted nitrogen transfer stick into main bath. Removed recovery hose. |
| | Begin LN2 transfer. |
| 1519 | End LN2 transfer. |
| 1620 | Fed Cricket 4 pellets. |
| 1756 | Main bath prepared for blow-out. Waiting for IVC background to stabilize before supplying helium to main bath. |
| 1808 | Right when opening IVC, rate jumped to 1.5E-6 mbar l/s, then started to decrease. Stable IVC leak rate: 4.5E-9 mbar l/s |
| 1811 | Begin blow out of LN2. |
| 1839 | The leak rate after blowing out the LN2 is 6.5E-9 mbar l/s. |
| 1959 | Restarted blowing out LN2 awhile ago. Apparently there was LN2 left. The transfer stick was not put low enough into the dewar. |
| 2016 | He gas canister ran out. Stop blow-out. |
| 2026 | Re-commence blow-out. |
| 2111 | End LN2 blow-out. Leak rate: 1.1E-8 mbar l/s. |
| 2135 | Background helium leak rate 1.4E-8 mbar l/s. Evacuate and fill main bath with helium gas. Helium leak rate unchanged. |
| | Dump mixture into fridge to check for leak in mixing chamber. No need to perform a throughput test so V1 on IGH remains closed; V3, V9 & V14 are open. Background helium leak rate 1.4E-8 mbar l/s. Leave for about 5 minutes. |
| 2148 | Leak rate unchanged. |
| 2219 | Lowered main bath. |
| 2300 | Fill IVC with 0.14 mbar N2 exchange gas to aid warm up. |
| 2335 | Fill N2 cold trap full. |