| 1020 | Fed Cricket 3 pellets. |
| 1425 | Fill N2 cold trap full. |
| | Cease pumping on mixing chamber. |
| | Mixing chamber temperature 20.7 K. Background helium leak rate 6.5E-10 mbar l/s. IVC leak rate 4.2E-8 mbar l/s. |
| 1505 | Helium leak rate in IVC is low enough to try condensing and circulating the mixture again. We should have just about enough helium (liquid level 10.9%). |
| | Switch off mixing chamber heater. |
| 1540 | Start 1 K pot, temperature 1.6 K. Mixing chamber temperature 20.3 K. |
| 1550 | Cease recovery of mixture from fridge. Close gate valve and condenser line speedivalve. Start cryocleaning mixture through nitrogen cold trap 2. Dump pressure 725 mbar. |
| 1635 | Begin LHe transfer (6.5%). |
| 1652 | End LHe transfer (31.6%). |
| 1726 | Pump mixture to dump to prepare for condensing. |
| 1740 | Fed Cricket 4 pellets. |
| 1908 | Started condensing awhile ago. V12A is all the way open now. Going to leave mixture to condense in lines overnight and for temperature of mixing chamber to cool. |