2012/11/30
| 1000 | Filled LN2 cold trap. |
|---|---|
| Fed Cricket. | |
| 1130 | Had to restart mixture cleaning. Underway now. |
| 1720 | Mixing chamber temperature: 78.9 K. Begin pumping out exchange gas with scroll pump. |
| Fed Cricket. | |
| 1744 | Open up turbo pump to IVC. Isolate scroll pump and turn it off. Pump on IVC overnight. |
| 1835 | Electrical checks done at 78 K. Everything seems consistent. |
| 1940 | Filled LN2 cold trap. |