| 1010 | Fed Cricket 3 pellets. |
| 1110 | Removed He and N2 coldtraps. |
| 1336 | Re-tightened IVC flange. |
| 1340 | Begin heating cold traps. Heating cold traps without He-4 pump on, then evacuating the line. |
| 1350 | Begin leak check tests. Calibration is fine. |
| | Background rate: 1.9E-9 mbar l/s. |
| 1415 | After checking all flanges, including the bottom flange twice, leak rate is 2.3E-9 mbar l/s. No gross leak detected!!. |
| 1640 | Finished cleaning cold traps. |
| 1655 | Quick electrical check. Similar results as before. |
| 1943 | Returned cold traps to their proper spots. Raised dewar. Filled LN2 cold trap. Begin mixture cleaning. |
| 1959 | Open leak checker to IVC (background rate is 1.7E-9 mbar l/s) and isolate turbo pump. Evacuate main bath. |
| 2012 | Flushed main bath with He gas. Leak rate is 2.4E-9 mbar l/s. No gross leak found. |
| 2015 | Evacuated 1 K pot. |
| 2027 | Entered 4.6 mbar of exchange gas into IVC. |
| 2049 | Begin LN2 transfer. |
| 0010 | End LN2 transfer. Put on ping pong ball. |
| | Mixture cleaning isn't going so well. Cold trap iced up and had to go below 12.8% for the flow to finally stop (even at 12.8%, closing V13b showed a high flow rate). Trying to start over again, but currently at 13.4% and no sign of flow at all. |