| 0420 | Pressures in G1 & G2 are 68 mbar & 58 mbar respectively. This would seem to indicate a blockage in the helium cold trap. Mixing chamber temperature is holding steady at around 59-60 mK. Helium cold trap will need to be cleaned, but hopefully this can wait until we finish taking IbIs curves. |
| | Fill N2 cold trap full. Probably a good idea to keep it topped up regularly to prevent blockage in helium cold trap becoming larger. |
| 1010 | Fed Cricket 3 pellets. |
| 1015 | Filled LN2 cold trap. |
| 1700 | Began LHe transfer (26.8%). |
| 1740 | Stop helium transfer. Helium liquid level 89.8%. |
| 2355 | Phonon pulses from DIB 2 look pretty noisy. Timing link does not appear to be the problem. Qi baseline also appears to be a littl wavy. Give SQUIDs two quick zaps and see what happens. |