UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20121020

2012/10/20

0625 Flash for one hour, followed by cool down for 2 hours. Then take 3 hour-long Ba-133 data series at -/+3 V bias, followed by three 60-minute Ba-133 data series at +/-3 V bias. Flash all LEDs for 6 seconds between data series with usual settings, and wait 20 minutes for cryostat to cool. Finish with a 20 minute flash and 2-hour cool down.
0745 Fill N2 cold trap full.
Fed Cricket 4 pellets.
1850 DAQ crashed on first event from first -/+3 V data series 07121020_0929. It appears as though the connection to DCRC32 was lost.
2020 After a bit of digging around, found the problem. Port 5000 on DCRC32 had not been released after test run's flash and cool down. As a result, when DAQ tried to connect to DCRC32 at the start of the first -/+3 V data series, the port was blocked. Side 1 may have been under bias for a few hours, but a one hour flash should be enough to neutralise the crystal.
Start data acquisition again. Flash for one hour, followed by cool down for 2 hours. Then take 3 hour-long Ba-133 data series at -/+3 V bias, followed by three 60-minute Ba-133 data series at +/-3 V bias. Flash all LEDs for 6 seconds between data series with usual settings, and wait 20 minutes for cryostat to cool. Finish with a 20 minute flash and 2-hour cool down.
Mixing chamber temperature 59.8 mK. Pressures in G1 U& G2 are 63 mbar & 73 mbar respectively. Cryogenics-wise, fridge seems to be operating well.
2025 Fill N2 cold trap full.
Fed Cricket 4 pellets.