| 1010 | Fed Cricket 3 pellet. |
| 1040 | Filled LN2 cold trap full. |
| 1500 | Filled IVC with 4.6 mbar of N2 exchange gas. |
| 1540 | Evacuate 1 K pot and main bath. Overpressure main bath with helium gas. There is no need for a leak check at this point in time as we are pretty sure we do not see a leak at this temperature (mixing chamber temperature 227 K), and even if there was a leak, we would not be able to pinpoint its location. Performing a leak check when blowing out the nitrogen from the main bath tomorrow will yield better dividends. |
| 1550 | Begin nitrogen transfer. |
| 1710 | Nitrogen transfer complete. Attached ping-pong ball. |
| 1720 | Fed Cricket 4 pellets. |