| 1015 | Fed Cricket 3 pellets. |
| 1040 | Began pumping mixture to the dump, to avoid overloading the 1K pot. This issue is due to running out of LHe. |
| 1055 | Filled LN2 cold trap. |
| 1130 | Began LHe transfer (-1.0%). |
| 1235 | End LHe transfer (71.7%). |
| 1450 | Switched on mixing chamber heater, power 10mW, to aid extraction of mixture. |
| 1645 | Pressure in P1 is 730 mbar. Looks like we've recovered all the mixture. Turn off mixing chamber heater. |
| 1800 | Pressure in dump 732 mbar. Start condensing mixture manually through nitrogen cold trap 1. |
| 1820 | Left 390 mbar in dump. Mixing chamber temperature 7.7 K and falling. Will wait until temperature drops before starting circulation. Fully open valve V12A on IGH to conclude condensing mixture. |
| 2135 | Mixing chamber temperature 2.24 K, most of the mixture has condensed. Start automated circulation procedure. |
| 2325 | Mixing chamber has reached 109 mK and is still cooling slowly. Stop automated circulation procedure. |
| | Start flashing detector. |