2012/09/10
| 0000 | Mixing chamber temperature 108 mK. This is probably the best we can hope for. |
|---|---|
| Plug in DCRC33 into DIB 1 and DCRC32 into DIB 2. Start flashing detector: LEDs 1 & 2 on DIB 2 and LED 2 on DIB 1; current -0.6 mA, flash on time 100 μs, flash off time 5 ms. | |
| 0005 | Fill N2 cold trap full. |
| 0955 | Filled LN2 cold trap. |
| 1010 | Fed Cricket 3 pellets. |
| 1255 | Stop flashing detector. |
| 1705 | Start taking data, triggering on 4 charge channels at 40 ADC bins, +/-4 V bias to +/-12 V bias in 2 V increments, 3 series per bias, 6 seconds flashing & 20 minutes cooldown between series, Ba-133 source 6“ below top of mu-metal shield. |
| 2335 | Fill N2 cold trap full. |