| 0955 | Fed Cricket 3 pellets. |
| 1010 | Cleaned Cricket's bowl. |
| 1017 | Filled LN2 cold trap. |
| 1200 | Turned on leak checker and let it warm up for at least 20 minutes. Calibration was good. Isolated turbo pump. Leak rate of line up to IVC: 1.4E-9 mbar l/s |
| | Leak rate of IVC : 1.6E-6 mbar l/s |
| | Isolated IVC. Re-opened turbo pump to IVC line. Isolated leak checker |
| 1214 | Pump mixture to dump. |
| 1217 | Start 1 K pot. |
| 1330 | Isolate dump by closing all valves on IGH. Open gate and condenser valves. Begin automatic condensing process. |
| 1525 | Abort automatic condensing process. Begin automatic circulation process. |
| 1725 | Fed Cricket 4 pellets. |
| 1830 | Stop automatic circulation procedure. Mixing chamber temperature 107 mK and still cooling. Pump mixture into dump. Stop 1 K pot. |
| 2150 | Turn on mixing chamber heater (power 10.0 mW) and open valve V5 on IGH in an effort to recover mixture quicker. |
| 2305 | Switch off mixing chamber heater. Almost all of the mixture has been pumped into the dump. |
| 2315 | Fill N2 cold trap full. |